Archive for the 'VP/Roads/Water Company Liaison' Category

Published by admin on 04 Dec 2008

Roads are closed to construction traffic

Effective today we have closed the roads to heavy vehicles for the winter. The ground is beginning to freeze in many areas. This morning the roads were icy, very slick and and dangerous. For the remainder of the winter, we will not allow construction vehicles larger than a pickup to enter the subdivision. It required so much of our time to consider all the requests for exceptions to the road closing last month that we can no longer take such requests. The roads are closed to heavy traffic until next spring. Please note that your contractor can still come in with a pickup, weather permitting. However, pickups without chains endanger everyone else on the mountain on icy days. Please ask your contractor to follow the rules.

Gary Hume
The Road Guy

Published by admin on 18 Sep 2008

Roads – The ups and downs along with the in and outs

Summer was way too short for the many projects we identified to do and winter is just around the corner. As those of you with property on the upper part of the mountain may have noticed, we have removed the brush and some trees at the corner of Blue Spruce and Cut Off Road (or Club House as some may know it). Many of you have called me and asked about the “big drop off.” Our road crew is in the process of widening Cut Off Road, along with reducing the steepness of the slope at this intersection. This intersection is probably the worst one on the mountain. This part of the road has always had very steep sides and has always been dangerous but no one ever knew just how much it dropped off there until we removed the brush. Most of the fill dirt for this project is being moved from the new building site where we are making room for the driveway and parking area.

Some of you may have noticed that there are big cement boxes along some of the roads – these cement boxes are going to be put in the ground and connected to the culvert that runs under the road. These boxes will help keep dirt from filling up the pipe and will prevent trucks from crushing the end of the culvert. This will improve the drainage water flowing down the bar ditches.

Some have asked about our paving plans. We are not paving anything this year and perhaps not next year. Asphalt has jumped in price just like the gas for your car because it is an oil-based product. One of the reasons we will hold off for at least one year is that it costs so much to mobilize a paving crew. If you have, only so much money you end up spending it on the mobilization of the equipment and then have very little left to pay for actual pavement. This is why we have elected to hold off and try to have money saved from one year to the next so we can pay one mobilization fee and have more funds available to pave a longer stretch of road.

Questions have been asked about street signs and why have so many disappeared. Good question. Why someone would want to take our street signs? We have identified all that are currently missing and will be ordering them in the next few days. Additional speed limit signs are also being ordered and placed on each road. Just as a reminder, the speed limit is 25 mph on the paved roads, 20mph on the non-paved roads, and 15 mph on all corners. Please remember these limits apply to every vehicle, including ATVs. Your help in enforcing the limits is always appreciated.

As I have previously noted on the Board Blog (timberlakesutah.com) the snow route will consist of the main roads being plowed first and then the secondary roads next. Many have asked, “What about my road?” As time and money allows, we will get to most of the roads in reasonable time. We will always plow the Dugway first, then Blue Spruce and Ridgeline. After that, we will work the other roads as we can. Mother nature will dictate what part of the mountain is plowed first. We have two full-time road employees and they are on overtime after 40 hours – so we try to use their time wisely.

For any question you have about the roads and road projects please email me at roadguy@timberlakesutah.com

A point of clarification – I attend the Water Board meetings on behalf of the TLPOA Board, I am not the Water Company!

I look forward to your comments and questions.

Gary Hume
The Road Guy

Published by admin on 07 Aug 2008

Snow plowing

Many have asked about our winter snowplowing schedule. Timber Lakes has a full-time crew of two people who maintain the roads year-round. In the winter, the snowplow process is not dictated by an exact schedule. The first road to be plowed is the paved section referred to as the Dugway. This is paved portion of Lake Pines Drive. Generally, the second road to be plowed is Blue Spruce and the third is Ridgeline.

This schedule is always subject to change based on the amount and location on the mountain of snowfall.

As time permits and the main roads are cleared, the crew then plows side roads that feed into the above-mentioned roads. If the west side get more snow than the east side then we will work on that area first or if the east side (upper part of the mountain) gets more snow we will spend more time in that area at first.

Our crews are on a 40-hour week and we try to manage their time so they are available to work on the roads when Mother Nature decides to let it snow. We generally do not start plowing until there is at least 6 inches of new snow.

If you have additional questions about plowing, please check our website for updates during the winter months.

Please remember that snow removal depends on several things, including the amount of snowfall, where the snow falls, availability of equipment, availability of our 2-man crew and availability of funds.

Published by admin on 11 Jul 2008

The road plan

There are always many questions by the lot owners as to what projects are ongoing and why “my road is not fixed”! We have been holding off on repairs to the roads while waiting to see if the water bond project was going to pass. Now that the water board has decided to move forward with the project, we can now prioritize our road projects.

John B. and I attended a meeting with some of the water board members this week and worked on a plan as to what part of the mountain they would suggest to the contractor he work on first. I have been holding off on applying any new road base to the roads that will be dug up (approximately 18+ miles of road) when the new water pipe is laid as this would be a waste of our dollars. If we laid down new base now the new base would be mixed into the dirt and then reapplied. This does not make for a good road base.

It looks like the water contractor will start laying pipe in early September. The water company will probably ask for them to start on the upper part of the mountain (as that is where most water leaks are) and a second crew start on the west side. If snow hits the upper mountain early this year, that crew will probably move to the west lower side.

As the pipe is laid in the ground on the side roads those roads will be put back to some improved condition and then most will receive an additional 3 inches of road base added to the surface. Our road guys will be working ahead of the pipe laying crews making sure that the roads are widened where and when possible and that excess dirt from the pipe trench is used to improve certain road dips and humps. Our biggest challenge is that we have only two road guys, while the pipe laying company may have up to four crews available for this project at any one time. Math says we cannot keep ahead of all the pipe crews with just our two guys so we will be working on the areas that need the most work as our priority.
We will be evaluating all the intersections and trying to figure out how we can improve them, if possible, if and when we have excess dirt and time available.

Our original intent was to have the pipe crews do Blue Spruce first so we could improve that road. After some additional consideration we decided to do Blue Spruce last as there will be a large volume of heavy trucks going up and down that road in relation to the water pipe project which could cause considerable damage to that section of the road.

There is no doubt that the main roads will be in very poor shape for the next 1-2 years. We will do the best we can to keep the roads graded and as smooth as possible.

In a project of this nature there are a lot of “ifs”, “when” and “buts”. We have a road crew of two men and a whole lot of work to do with very little money. Please be patient with us over the next few years. When we are all through I think the mountain will defiantly be in the best shape is has been in years.

Thanks for your patience.

Gary Hume
Road Guy

Published by admin on 27 May 2008

Road Update

As I commented in the last update – if the snow would stop coming down we could get to work on the many projects we have in relation to the roads. The snow came again over the holiday weekend, much to the disappointment of many 4 wheelers. We are still waiting to define major projects to see what direction the water company takes in regards to the improvement bond. If they continue with the bond project it will keep us busy working on the roads where they are laying pipe.

I would like to take this opportunity to welcome back as our Mountain Road Manager, Mike Camper. Mike knows the mountain like the back of his hand and also has a lot of knowledge about what has gone on here for many years. Mike is joined by Rick Straton who has been working on the roads by himself for the past few months. These two guys have a lot of work ahead of them this summer, starting with digging out the culverts that have been covered up with mud this past year.

Some folks wonder what the projects are and who gives the priority to the projects. The Board listens to you, the lot owners, as to what needs to be fixed or improved on the mountain. Not all the requests make the “to do list” but they are prioritized based on overall benefit to the majority of the owners. When driving down our Timber Lakes roads please remember the speed limit is 25 mph. I was out picking up trash on the Dugway last Saturday with two of my grandkids and folks drove by us at speeds that only an autobahn has seen in Europe. Please slow down and enjoy the sites as you drive to you cabin.

Some owners are already asking what roads will be plowed next winter. We will not make that decision until this fall. We will first take into account the main roads and then the feeder roads, looking at how much each road is traveled. We will post a detailed list by fall as to what the priorities will be.
Thanks

Gary
The road guy

Published by admin on 02 May 2008

I’m your Road Guy

Hello Timber Lakes owners (full time, part time and lot owners):

Every time I get ready to write this update about the roads I start to say, “now the snows are over” it snows again. We did make it through the winter thanks to Don, Bonnie, Gordon, Rick (our current mountain employee) and many others. My thanks to them and anyone else that helped. As the snow melts, the ruts get wider, deeper and the road base becomes thinner. We are currently reviewing the roads and the budget to see what the projects will be for the summer. This past winter took a real toll on our equipment when we were trying to clear the roads with employees that were not completely trained on the equipment. We are currently looking to hire a full time “Mountain Road Manager.” We hope to fill this position soon as we have many projects to complete before winter arrives again.

We anticipate one of the projects this summer is to place major culverts on the main roads in order to channel the rain and snow runoff and keep it from running down the middle of the road. This project will close part of the main roads from time to time as we work to place these culverts. We ask for your patience during the road detours.

The road group is very excited about the new maintenance building you can read about on Ole’s blog. This building will allow for the parking of all the road equipment inside and out of the harsh weather. We hope to be in the new building by late fall.

We are currently enlarging the parking area near the office and when completed should have about doubled the current space.

One last thing is if you, family or friends are riding ATV’s on the Timber Lakes roads please do not tear up the roads by doing donuts or riding through the bar ditches. It is your money and if you tear up the roads we will eventually fix them and you will ultimately pay – it’s your maintenance fees!

Stay tuned to this site for updates on what is happening with the road group!

Your feedback is always appreciated.

Your “Road Guy,”

Gary Hume

« Prev